The module SH2 may be chosen only where all activities contributing to the subsystem project to be verified (design, manufacturing, assembling, installation) are subject to a quality system for design, production, final product inspection and testing, approved and surveyed by a notified body.
Modul SH2 se lahko izbere samo v primeru, da se za vse dejavnosti, ki prispevajo k projektu podsistema za preverjanje (projektiranje, proizvodnja, montaža, namestitev), uporablja sistem kakovosti za projektiranje, proizvodnjo, pregled končnih izdelkov in preskušanje, ki ga odobri in nadzoruje priglašeni organ.