Vseevropski železniški sistem za visoke hitrosti, za katerega velja Direktiva 96/48/ES in katerega del je podsistem vodenje-upravljanje, je integriran sistem, ki zahteva preverjanje funkcij, vmesnikov in zmogljivosti (vsi so osnovni parametri), zlasti za zagotovitev, da je sistem interoperabilen in da so izpolnjene bistvene zahteve.
The trans-European high-speed rail system, to which Directive 96/48/EC applies and of which the control-command subsystem is a part, is an integrated system which requires the functions, interfaces and performance (all of which are basic parameters) to be verified, in particular so as to ensure that the system is interoperable and that the essential requirements are met.